Permits
During the process of development, a number of permits are required through the city and other governments. Efforts have been made to keep this list current, the absence of any permits or forms does not imply they are not required by the city or any other entity. Additional permits can be found on the Engineering Guidelines and Checklist page. If you have any questions about these or any permits contact the Engineering Division.
Below are several, frequently required permit applications.
- Right of Way Permit
- Soil and Water Conservation Plan Review
- Sewer Connections / Extensions
- Permit / Construction Approval
Requirements
When
Any project that would modify the right of way, temporarily or permanently. All projects that require digging within the right of way or street. For example, repair of a sewer connection, replacing a driveway, replacing sidewalk or connecting a sump pump.
What
For Homeowners:
- Right-of-Way Permit - General (PDF) - This form is for general projects that involve work within the right-of-way, such as curb or sidewalk removal and replacement, street cuts, sump pump connections and utility improvement and repairs.
- Right-of-Way Permit - Driveway Apron (PDF) and $47 recording fee, if applicable. This form is for driveway improvement projects that involve the installation, repair or replacement of a driveway apron.
- Right-of-Way Permit - Service Walk (PDF) and $47 recording fee, if applicable. This form is to be submitted when a service walk is being repaired or replaced.
- Right-of-Way Permit - Parkway Tree (PDF), if applicable. This form is to be submitted when the only right-of-way work is for the planting of a tree in the parkway.
- A Plat of Survey highlighting the area in which the work will be conducted.
- A copy of an IDOT and/or County ROW Permit, if applicable
For contractors (in addition to the Homeowner requirements):
- A $10,000 surety bond (PDF) or 1.5 times the estimate of the cost of work, whichever is greater being site specific by indicating the address of the job site or a $75,000 surety bond to perform and complete the work for a period of one calendar year from the effective date of the bond.
- An Insurance Certificate (PDF) naming City of Batavia as Additional Insured.
Who to Contact
Call the City of Batavia Building Department at 630-454-2700 for questions. Many permit applications are available online at Permits or Engineering Guidelines and Checklists. All permit applications are available at the Public Works Facility at 100 North Raddant Road or the Community Development Office at City Hall.
Requirements
When
All projects that are being submitted for Final Engineering Review. The Kane-DuPage Soil and Water Conservation District (KDSWCD) reviews all plans to insure that erosion and sediment control procedures are adequate.
What
- A plan review application (PDF), a submittal fee, final engineering plans
Who to Contact
Copies of the permit review application are available at the Community Development office and through the KDSWCD. Both the Engineering Department and the conservation district can answer questions.
Requirements
When
- Schedule A is required for all sewer connections which will not be maintained by the municipality or public agency. Schedule B is required for sewer extensions that will be maintained by a municipality.
What
- A completed application (PDF) and fee is needed. Visit IEPA's website for a complete list of available forms for required permits.
Who to Contact
- Questions should be directed to the IEPA.
Requirements
When
- Construction of new sewers, sewage pumping stations and connections to public sewers which are 1500 gallons per day or larger, or serve two or more buildings.
What
- A completed application (PDF) and fee is needed. A completed application includes signatures on the WPC-PS-1 form from the City as owner of the sewer and treatment plant.
Who to Contact
- Questions should be directed to the IEPA.
Contact Us
-
Engineering Division
200 N Raddant Road
Batavia, IL 60510
Phone: 630-454-2750
Fax: 630-454-2351Hours
Monday - Friday
7 a.m. - 4 p.m.Rahat Bari, P.E.
City Engineer
Email
Staff Directory